Hyderabad Vanaspathi Ltd., M/s v. A.P. State Electricity Board, (SC) BS77431
SUPREME COURT OF INDIA

Before:- S.C. Agrawal, S. Saghir Ahmad and M. Srinivasan, JJ.

Civil Appeal No. 2558 of 1988 with Civil Appeals Nos. 7139-7144 of 1977. D/d. 1.4.1998.

M/s Hyderabad Vanaspathi Ltd. - Appellant

Versus

A.P. State Electricity Board and others - Respondents

For the Appellant in C.A. No. 2558/88 :- Sunil Gupta, Ms. Manju Mishra, K.J. John, Advocates.

For the Appellant in C.A. Nos. 7139-44/97 :- Shanti Bhushan, K. Rajendra Chowdhary, Sr. Advocates Rakesh K. Sharma, Advocate.

For the Respondents :- Rajendra Chowdhary, Sr. Advocate Rakesh K. Sharma, A Subba Rao, Y. Raja Gopala Rao, Advocates. A. Electricity (Supply) Act, 1948, Section 49 - Terms and conditions for electricity supplies statuary notified by Board - Fact that individual agreement is entered by Board with each consumer - Held that does not make terms and conditions for supply contractual.

[Paras 25 and 20]

B. Electricity (Supply) Act, 1948, Section 49 - Terms for supply notified in B. P. Ms. No. 690, Decided on 17-9-75 clause 39 - Clause 39 defining malpractices and providing for adjudicatory machinery - Not outside power of Board under Section 49 - Held that clause 39 does not also contravene provisions of Electricity Act, 1910, Section 21, 26.

[Para ]

C. Constitution of India, Article 14 - Electricity (Supply) Act, 1948, Section 49 - Terms and conditions for supply notified in B. P. Ms. No. 690, Decided on 17-9-1975, Clause 39 - Clause 39 providing for disconnection of supply by officers of Board on suspicion of malpractice - The consumer has to pay 50% of the provisional amount before restoration - Held that principle of Nemo judex in cause sua - Does not apply.

[Para 43]

Cases Referred :-

Punjab State Electricity Board v. Bassi Cold Storage, Kharar, 1994 Supp (2) SCC 125.

Bihar State Electricity Board v. Parmeshwar Kumar Agarwala, (1996) 4 SCC 686.

Workmen v. Firestone Tyre and Rubber Co. of India (P) Ltd., SCC at p. 832 (1973) 1 SCC 813.

Shri Vidya Ram Misra v. Managing Committee, Shri Jai Narain College, (1972) 1 SCC 623.

Exeuctive Committee of Vaish Degree College, Shamli v. Lakshmi Narain, (1976) 2 SCC 58.

Powell v. May, (1946) 1 All England Reporter 444.

Commissioners of Customs and Excise v. Cure and Deeley Ltd., (1961) 3 All England Reporter 641.

Jiyajeerao Cotton Mills Ltd. v. Madhya Pradesh Electricity Board, 1989 Supp. (2) SCC 52.

Agricultural Market Committee v. Shalimar Chemicals Works Ltd., (1997) 5 Supp SCC 516.

State of U.P. v. Hindustan Aluminium Corpn., (1979) 3 SCC 229.

Andhra Pradesh Carbides Ltd. v. Andhra Pradesh State Electricity Board, Hyderabad AIR 1986 Andhra Pradesh 37.

M.P.E.B. v. Smt. Basantibai, (1988) 1 SCR 890.

Municipal Corporation of Delhi v. Ajanta Iron and Steel Company (Pvt). Ltd., (1990) 2 SCC 659.

M.P. Electricity Board, Jabalpur v. Harsh Wood Products, (1996) 4 SCC 522.

Belwal Spinning Mills v. U.P. State Electricity Board, (1997) 6 SCC 740.

Mohapatra and Co. v. State of Orissa, (1984) 4 SCC 103.

State of Karnataka v. Shree Rameshwara Rice Mills, Thirthahalli, (1987) 2 SCC 160.

Krishna Bus Service Pvt. Ltd. v. State of Haryana, (1985) 3 SCC 711.

Rattan Lal Sharma v. Managing Committee, Dr. Hari Ram (Co-education) Higher Secondary School, (1993) 4 SCC 10 .

LIC of India v. Consumer Education and Research Centre, (1995) 5 SCC 482.

Patel Parshottamdas Vanmalidas v. Gujarat Electricity Board, AIR 1987 Gujarat 188.

Pawan Alloys and Casting Pvt. Ltd., Meerut v. U.P. State Electricity Board, (1997) 7 SCC 251.

JUDGMENT

M. Srinivasan, J. - I. RELEVANT FACTS.-

The appellant in the earlier appeal of 1988 is a public limited company engaged in the manufacture of Vanaspathi. It entered into two agreements with Andhra Pradesh State Electricity Board hereinafter referred to as 'Board' on 1-9-1970 and 27-8-1973 for supply of High tension power. In January, 1976 the officers of the Board inspected the factory premises and noticed pilferage of energy. The power supply was immediately disconnected and a provisional assessment of the loss was made at Rs. 61,28,535/-. A prosecution was launched under Section 379 I.P.C. read with Section 39 of the Indian Electricity Act, 1910, hereinafter referred to as the Electricity Act in the Court of the Chief Metropolitan Magistrate, Hyderabad. The Board also initiated proceedings calling upon the appellant to file its objections to the provisional assessment. The appellant denied the allegations made by the Board. After enquiry, the final assessment was made fixing the loss at Rs. 55,72,511.81 Ps. The order was challenged by the appellant in appeal but in vain. The appellant filed a suit in the Court of Additional Chief Judge, City Civil Court (Temp), Hyderabad for a declaration that it was not liable to pay any amount as penal damages and prayed for a direction for refund of the amount of Rs. 22.50 lakhs collected by the Board during the pendency of the assessment proceedings and for perpetual injunction restraining the defendants therein from disconnecting the power supply.

2. The suit was contested by the Board. Several issues were raised including one relating to the jurisdiction of the civil Court. The trial Court held that it had jurisdiction to try the suit but negatived all the contentions of the plaintiff and dismissed the suit. On appeal, a Division Bench of Andhra Pradesh High Court rejected the pleas of the appellant and dismissed the same. The High Court held that the terms and conditions of supply on the basis of which the agreements were entered between the appellant and the Board did not in any way contravene the provisions of either the Electricity Act or the Electricity (Supply) Act, 1948, hereinafter referred to as the Supply Act. It was also found that ample opportunity was given to the appellant before the final order of assessment was made and that the enquiry held by the officers of the Board was in no way vitiated. Aggrieved by the said decision of the High Court the appellant preferred the said appeal on obtaining Special Leave of this Court.

3. The questions which were decided by the High Court in the aforesaid proceedings were raised again in Writ Petitions under Article 226 of the Constitution of India by some industrial undertakings which had also entered into agreements with the Board for supply of electricity. When proceedings were initiated by the Board against those industrial undertakings on the ground of pilferage of electrical energy and supply was disconnected pending enquiry, those undertakings filed Writ Petitions challenging the validity of such proceedings. In one of the writ petitions, an appeal was filed against an Interlocutory Order refusing to grant interim relief to the petitioner therein. When that appeal was admitted by a Division Bench the matter was placed before a Full Bench for disposal as the Division Bench opined that the view taken by the Division Bench in the Civil Appeal referred to earlier was likely to be in conflict with the "possible view that the contractual obligation upon the consumer of electricity that in case of a dispute as to the consumption, the adjudication shall be by the officers of the Board shall be deviative of Article 14 of the Constitution of India". Thus all the writ petitions and the writ appeals against interlocutory orders were heard by a Full Bench of three Judges and disposed of by a common judgment dated 12-9-1997.

4. The Full Bench opined that the creation of the adjudicatory process by a contractual obligation in condition No. 39 of the 'Terms and Conditions of Supply' of electricity was wholly vitiated. The Full Bench observed that though there is no bar against the Board to recover compensation for the loss caused to it even when a consumer is prosecuted for the same offence under the Act, the enquiry into and estimate of the loss should be made by an independent and properly constituted body. Ultimately the Full Bench concluded its order as follows :

5. It is against the said judgment of the Full Bench the Board has filed the Civil Appeals Nos. 7139-7144 of 1997. All the appeals have been heard together as the contentions are common. For the sake of convenience, the parties will be hereafter referred to as the Board on the one hand and the consumers on the other.

6. The chief argument advanced on behalf of the consumers is that condition number 39 in the 'Terms and Conditions of Supply' of electricity which are purely contractual is ultra vires the provisions of the Indian Electricity Act, 1910 hereinafter referred to as the 'Electricity Act' and Electricity (Supply) Act, 1948 hereinafter referred to as the 'Supply Act'. Alternatively, it is contended that even if the terms are statutory in nature, the condition is not valid. Thirdly, it is argued that the said condition is violative of Article 14 of the Constitution of India. Per contra, it is contended on behalf of the Board that it is performing a statutory obligation to supply electricity and has been empowered by the provisions of Section 49 of the Supply Act to impose such terms and conditions as it thinks fit. The conditions which have been so imposed including condition number 39 are statutory in character and are in no way contrary to the provisions of either of the enactments. The conditions are also quite reasonable and cannot in any sense be termed arbitrary and violative of the provisions of Article 14 of the Constitution of India.

II. RELEVANT STATUTORY PROVISIONS

7. Before adverting to the rival contentions, it is necessary to refer to certain provisions in the two enactments namely Electricity Act and the Supply Act. An Electricity Act was passed originally in 1903 but it was repealed by the Electricity Act which amended the law relating to the supply and use of electrical energy. The said Act was not a complete Code on the subject. It was apparently found to be inadequate for co-ordinating development of electricity on regional basis. Hence, the Supply Act was enacted in 1948 to provide for rationalisation of the production and supply of electricity and generally for taking measures conducive to electricity development. While the earlier Act deals with the supply and use of electric energy and the rights and obligations of the licensees, the later Act deals with statutory powers and functions of the Central Electricity Authority, State Electricity Boards and Generating companies. Section 70(1) of the later Act provides for giving an overriding effect to its provisions in so far as there is any inconsistency therewith in the provisions of the earlier Act or any Rules made thereunder or any instrument having effect by virtue of the said Act or Rules. The proviso to sub-section (1) clarifies that nothing in the later Act shall be deemed to prevent the State Government from granting, after consultation with the Board, a licence not inconsistent with the provisions of the earlier Act to any person in respect of such area and on such terms and conditions as the State Government may think fit. Sub-section (2) makes it clear that save as otherwise provided in the later Act, the provisions of the Act shall be in addition to and not in derogation of the earlier Act.

8. Section 26 of the Supply Act is to the effect that the Board shall in respect of the whole state have all the powers and obligations of the licensee under the Electricity Act and the later Act shall be deemed to be licence of the Board for the purpose of the earlier Act. The first proviso to the Section excludes the applicability to the Board, of Sections 3 to 11, sub-sections (2) and (3) of Section 21, Section 22, sub-section (2) of Section 22A, Sections 23 and 27 or clauses (i) to (v), clause (vii) and clauses (ix) to (xii) of the Schedule to the Electricity Act relating to the duties and obligations of a licensee. The second proviso states that the provisions of clause (vi) to the Schedule to the earlier Act shall apply to the Board in respect of that area only where distribution mains have been laid by the Board and the supply of energy through any of them had commenced.

9. In view of the provisions of Section 26 of the Supply Act our attention has been drawn by the learned counsel for the consumers to some only of the provisions of the Electricity Act. Section 20 sets out the power of the licensee or any person duly authorised by the licensee to enter the premises to which energy has been supplied and remove fittings, etc. in certain circumstances and the procedure therefor. Sub-sections (1) and (4) of Section 21 are in the following terms :

10. Learned counsel has also drawn our attention to Sections 35 and 36 of the said Act as well as Rules 4 to 6 of the Indian Electricity Rules framed under the Act. Section 35 deals with the constitution of the Advisory Board and Section 36 deals with the appointment of Electrical Inspector. Rules 4 to 6 provide for the qualifications of Inspectors etc. We are not extracting those provisions as they are unnecessary in this case. In the course of arguments our attention has also been drawn to Rule 27 which provides for Model conditions of supply as contained in Annexure VI.

11. Apart from the above, strong reliance is placed on Clause VI of the Schedule to the Act which deals with requisition for supply to owners or occupiers of any premises situate within the area of supply of a licensee. Sub-clause (1) and sub-clause (3) of Clause VI read as follows :-

12. Turning to the provisions of the Supply Act, apart from the Sections which we have referred to earlier, reference may be made to Sections 18 and 19. While Section 18 sets out the general duties of the Board, Section 19 sets out the powers of the Board. Section 49 is the most relevant provision in this case and it reads as follows :

13. Section 78 enables the Government to frame Rules to give effect to the provisions of the Act, Section 79 empowers the Board to make regulation not inconsistent with the Act and the Rules made thereunder to provide for all or any of the matters set out therein. One of them is "(j) principles governing the supply of electricity by the Board to persons other than licensees under Section 49". Section 79A provides that every rule made by the State Government under Section 78 and every regulation made by the Board under Section 79 shall be laid as soon as may be before the State Legislature.

III. RELEVANT CLAUSES OF THE TERMS AND CONDITIONS OF SUPPLY

14. Clause 39 which is the main target of attack defines various malpractices and provides for enquiries by designated officials. Clauses 39.4, 39.5, 39.6 read as follows :-

Sl. No.

Particulars


Officer or officers authorised


To inspect the premises and make provisional assessment

To disconnect and issue provisional assessment notice to the consumer

To make final ass.

Appellate authority


2.

H.T. Service including temporary supply

ADE.DE and S.E.

ADE in-charge

S.E.C.E.


15. The provisional assessment of the loss referred to in clause 39.6 shall be made on the principles set out in clause 39.7.1 and 39.7.2. It is provided that assessment shall be made for the estimated period of malpractice subject to a maximum of one year prior to the date of inspection. Clause 39.8.1 and 39.8.2 provide for provisional assessment notice in the case of malpractices other than supply of electricity to a disconnected premises and disconnection of service on the consumer's failure to pay the provisionally assessed amount.

16. Clause 39.9 is in the following terms :

17. Against the order of final assessment an appeal lies to the designated authority. The appellant may be represented by an advocate before the appellate authority at the hearing. The appellate authority shall give his reasons for his conclusions except in cases where the appeal is allowed in toto. Clause 39.10.6 provides that the order on appeal shall be final subject to clause 39.11 and be not liable to be questioned in any court of law, clause 39.11 is in the following terms :

18. Clause 46 reads thus :-

19. Appendix III contains the form of H.T. agreement. The relevant clauses read as follows :

Signature of Consumer".

IV. NATURE OF AGREEMENT - STATUTORY OR CONTRACTUAL

20. We have already seen that Section 49 of the Supply Act empowers the Board to prescribe such terms and conditions as it thinks fit for supplying electricity to any person other than a licensee. The section empowers the Board also to frame uniform tariffs for such supply. Under Section 79(j) the Board could have made regulation therefor but admittedly no regulation has so far been made by the Board. The Terms and Conditions of Supply were notified in B.P. Ms. No. 690 dated 17-9-1975 in exercise of the powers conferred by Section 49 of the Supply Act. They came into effect from 20-10-1975. They were made applicable to all consumers availing supply of Electricity from the Board. The section in the Act does not require the Board to enter into a contract with individual consumer. Even in the absence of an individual contract, the terms and Conditions of Supply notified by the Board will be applicable to the consumer and he will be bound by them. Probably in order to avoid any possible plea by the consumer that he had no knowledge of the terms and Conditions of Supply, agreements in writing are entered with each consumer. That will not make the terms purely contractual. The Board in performance of a statutory duty supplied energy on certain specific terms and conditions framed in exercise of a statutory power. Undoubtedly the terms and conditions are statutory in character and they cannot be said to be purely contractual.

21. In Punjab State Electricity Board v. Bassi Cold Storage, Kharar, 1994 Supp (2) SCC 125, this Court held that the conditions of supply are akin to subordinate legislation.

22. On Bihar State Electricity Board v. Parmeshwar Kumar Agarwala, (1996) 4 SCC 686, the Court held that they are part of statutory terms and conditions. In para 16 of the judgment the Court said :

23. Learned counsel for the consumers has referred to, Shri Vidya Ram Misra v. Managing Committee, Shri Jai Narain College, (1972) 1 SCC 623. In that case Statute 151 framed under The Lucknow University Act, 1920 provided that the terms and conditions of service of a teacher must be incorporated in the contract to be entered into between the teacher concerned and the college. Hence the Court held that the terms and conditions mentioned in Statute 151 had proprio vigore no force of law. That decision has no relevance here.

24. The ruling in, Exeuctive Committee of Vaish Degree College, Shamli v. Lakshmi Narain, (1976) 2 SCC 58 , cited by learned counsel has no applicability as the Court found on the facts that the Executive Committee was not a statutory body.

25. We are unable to uphold the view expressed by the Full Bench in the judgment under appeal that the terms and conditions of supply are purely contractual. In our opinion the Terms and Conditions of Supply are statutory in character.

V. THE SUPPLY ACT

26. It is contended that Clause 39 of the Terms and Conditions of Supply falls outside the power conferred on the Board in Section 49 of the Supply Act. According to learned counsel the power of the Board to impose such terms and conditions as it thinks fit, is expressly made subject to the other provisions of the Act which means that the Board can impose only such conditions as may be found in an agreement between other ordinary licensees and consumers. The contention is that the Board can neither define malpractices nor prescribe an adjudicatory machinery for assessing and levying penal damages. Such matters are, according to counsel, essential legislative functions which cannot be delegated to the Board.

27. We are unable to accept the contentions. Section 49 empowers the Board to supply electricity on such terms and conditions as it thinks fit. It may also frame uniform tariffs. We have found that the terms and conditions of supply are statutory in character. They can be invalidated only if they are in conflict with any provision of the Act or the Constitution. Learned counsel have not shown to us any provision in the Supply Act with which Clause 39 is in conflict. In so far as the Supply Act is concerned, argument hovers around Section 49 only. The only limitation in that Section is that the terms and conditions of supply should be subject to the provisions of the Act. Clause 39 does not violate any provision in the Supply Act. It is the statutory duty of the Board to arrange for the supply of electricity throughout the State and for transmission and distribution of the same in the most efficient and economical manner. For that purpose it has necessarily got to prevent unauthorised user, pilferage or malpractices by the consumers. Hence the necessary safeguards have to be provided as part of the conditions of supply so that the consumers will be bound by them. While on the one hand, the Board has to recoup the loss suffered by such pilferage of other malpractices, it has also on the other got to stop immediately the continuation thereof. Hence the terms and conditions of supply have to provide for compensation as well as immediate disconnection. For ascertaining the loss and fixing the compensation, uniform procedure has to be framed and a machinery constituted. Clause 39 is only doing that. Every consumer is made fully aware of the said terms and he signs the contract only on that basis. He gives an undertaking in that contract that if he is found indulging in any malpractice etc. he shall pay additional charges as may be levied by the Board and that the Board have the right to disconnect supply of electricity to his premises for such period as may be decided by the Board.

28. Learned counsel for the consumers has drawn our attention to, Powell v. May, (1946) 1 All England Reporter 444, wherein a bye-law made by the local county council was struck down as ultra vires the powers of the council as it was repugnant to the provisions of certain statutes. The ruling has no application here.

29. Strong reliance is placed on the decision of the Queen's Bench Division in, Commissioners of Customs and Excise v. Cure and Deeley Ltd., (1961) 3 All England Reporter 641. The Commissioner of Customs and Excise were empowered by Section 38 (1) of Finance Act 1940 to make regulations providing for any matter for which provision "appears to them necessary" for the purpose of "giving effect to" the statutory provisions relating to purchase tax "and of enabling them to discharge their functions thereunder." The Commissioners made the Purchase Tax Regulations 1945. Regulation 12 provided that if any person failed to furnish a return as required by the regulation the Commissioners might determine the amount of tax appearing to them to be due and demand payment thereof which shall be deemed to be the proper tax. The Court held that the said Regulations 12 was ultra vires on three grounds : (i) It was no part of the functions assigned to the Commissioners to take on themselves the powers of a High Court Judge and decide issues of fact and law as between the Crown and the subject; (ii) it renders the subject liable to pay such tax as the Commissioners believed to be due, whereas the charging sections impose a liability to pay such tax as in law is due; (iii) It was capable of excluding the subject from access to the Courts and of defeating pending proceedings.

30. The ruling does not help the consumers in this case. The impugned Clause 39 does not suffer from the vices mentioned above. No doubt, Clause 39-10-6 provides that the order on appeal shall be final subject to Clause 39.11 and not liable to be questioned in any Court of Law. Similarly, Clause 39.11 makes the order of the Chairman or his nominee final not liable to be questioned in any Court of Law. But learned senior counsel for the Board, Mr. Shanti Bhushan, has fairly conceded that the orders are subject to judicial review and the jurisdiction of Courts cannot be taken away by that Clause. It is to be noted that the trial Court and the High Court have in this case upheld the jurisdiction of the Civil Court to entertain the suit and consider the validity of the orders passed by the Board against the consumers.

31. Reliance is placed on the decision in, Indian Express Newspaper (Bombay) Pvt. Ltd. Union of India, (1985) 1 SCC 641, to support the argument that Clause 39 is in breach of the principle of delegated Legislation. According to learned counsel the terms and conditions of supply may tantamount to a subordinate legislation but it must yield to the plenary legislation and that the Supply Act never intended to confer powers on the Board to frame such terms and conditions of supply including the power to adjudicate a dispute between itself and the consumer and assess the damages. We have already adverted to the provisions of Section 49 of the Supply Act and pointed out that the power conferred on the Board is not circumscribed by any limitation other than that it should not contravene the provisions of the Act. We are of the opinion that Section 39 is not violative of any provisions of the enactment.

32. In, Jiyajeerao Cotton Mills Ltd. v. Madhya Pradesh Electricity Board, 1989 Supp. (2) SCC 52 , the Court held that the Board has powers under Section 49(1) and (3) to levy higher charges for excess consumption of electricity and it is not essential for the Board to make regulations indicating the basis for such levy before making the demand.

33. Our attention has been drawn to, Agricultural Market Committee v. Shalimar Chemicals Works Ltd., (1997) 5 Supp SCC 516, in which it has been held that a delegate while making subsidiary rules or regulations cannot widen or restrict the scope of the Act or the policy or principle. The proposition has no application in the present case as we have found that the Board has not in any way violated any of the provisions of the Act by framing the terms and conditions of supply including Clause 39. Hence we reject the contention that Clause 39 is ultra vires the provisions of the Supply Act.

VI. THE ELECTRICITY ACT

34. It is vehemently argued that provisions in Clause 39 run counter to the relevant provisions of the Electricity Act. In particular, it is said that Clause 39.1 covers the same field as that of Sections 21(4) and 26 (6) (b) and Clause VI (3) of the Schedule in the said Act. According to learned counsel malpractice and pilferage defined in Clause 39 would be covered by the aforesaid provisions of that Act and the authority to decide the same is the Electrical Inspector appointed by the Government and not the officers of the Board. It is also argued that Clauses 39.2 and 39.3 are contrary to Section 20 of the Act and Clause 39.4 is contrary to Section 36 of the Act read with Rules 4 to 6 of the Indian Electricity Rules. According to learned counsel, the entire Clause 39 is violative of the provisions of Clause VI(i) in the Schedule to the Electricity Act as the latter enjoins on the Board to continue the supply of electricity save in so far as prevented by cyclone, floods, storms and other occurrences beyond its control. In short, the contention of the learned counsel for the consumers is that the procedure prescribed in the Electricity Act and the Rules would apply to all situations arising between the Board and the consumer and the same should be followed. According to him Clause 39 is invalid and unenforceable in as much as it deviates from the provisions of the Electricity Act and the Rules.

35. We are unable to accept any of the aforesaid contentions. We have carefully perused the provisions of the Electricity Act and we find that those provisions provide for a different situation. Clause 39 will come into play whenever there is malpractice or pilferage on the part of the consumer or a fraud played by the consumer. The Electrical Inspector has no jurisdiction to deal with those matters. He can be approached only when there is a defective meter or any defect in wires, fittings, works or apparatus. As regards, Clause (VI) of the Schedule to the Electricity Act, it is not applicable unless distribution mains have been laid down under the provisions of Clause (IV) or Clause (V) and the supply of energy through those mains or any of them has commenced. The provisions of Section 26 of the Supply Act exclude the applicability of Clauses (1) to (V) of the schedule to the Board. Hence Clause (VI) of the schedule cannot by itself apply and that is why the second proviso to Section 26 clarifies the position that the provisions of Clause (VI) of the schedule shall apply to the Board in respect of that area only where distribution mains have been laid by the Board and the supply of energy through any of them has commenced. The records before us do not disclose any pleading on the part of the consumers that the requirement of the second proviso to Section 26 have been satisfied. No question has been raised in that regard before the trial Court. No doubt, the Full Bench of the High Court has placed reliance on Clause (VI) of the Schedule and the grounds raised in the Special Leave Petition filed by the Board do not refer to the same. But in the absence of a specific pleading to that effect it cannot be presumed that Clause (VI) of the Schedule would apply. Even assuming that clause applies, it will not alter the situation. The difference or dispute referred to in sub-clause (3) of Clause (VI) will not cover fraudulent malpractice or pilferage. A perusal of the said sub-clause makes it evident that the matter shall be referred to an Electrical Inspector only in cases of defects mentioned therein and not otherwise. We have no hesitation to reject the contention of learned counsel for the consumers and hold that the provisions in Clause 39 do not contravene the provisions of the Electricity Act.

36. In, State of U.P. v. Hindustan Aluminium Corpn., (1979) 3 SCC 229 , the Court considered the expression "regulating" in Section 22 (b) of the Electricity Act and observed that the word "regulate" does not include prohibition. The ruling has no relevance whatever in the present case. In, Andhra Pradesh Carbides Ltd. v. Andhra Pradesh State Electricity Board, Hyderabad AIR 1986 Andhra Pradesh 37, a Single Judge of the Andhra Pradesh High Court held that regulations made under the Supply Act shall not be covered by Section 70 thereof and that Section 49 read with Section 70 of the said Act does not empower the Board to make a regulation inconsistent with the provisions of Section 24 of the Electricity Act. The ruling has no bearing in the present case as we have found that Clause 39 of the Terms and Conditions of Supply do not contravene the provisions of either Act.

37. In, M.P.E.B. v. Smt. Basantibai, (1988) 1 SCR 890 , this Court held that a dispute regarding the commission of fraud in tampering with the meter and breaking the body-seal is one outside the ambit of Section 26(6) of the Electricity Act and an Electrical Inspector has no jurisdiction to decide such cases of fraud. This Court has clearly pointed out that under Section 26(6) if the dispute is as to whether the meter is or is not correct, it is to be decided by the Electrical Inspector. We are entirely in agreement with that judgment.

38. In, Municipal Corporation of Delhi v. Ajanta Iron and Steel Company (Pvt). Ltd., (1990) 2 SCC 659 , this Court found that there was a provision in the agreement between the Delhi Electric Supply Undertaking and the consumer for service of notice as a pre-requisite for disconnection. Hence this Court upheld the decree for mandatory injunction directing restoration of supply of electricity discontinued during the pendency of the suit without issue of such notice.

39. In, M.P. Electricity Board, Jabalpur v. Harsh Wood Products, (1996) 4 SCC 522, the Court held that Section 24 of the Electricity Act would apply to a case of regular supply made and prior demand of payment of electricity charges and it does not apply to demand on detection of pilferage. The Court upheld the validity of similar conditions of supply of electricity and held that on a prima facie conclusion of power-theft reached by the authorities, it was not necessary to give further hearing to the consumer and the action taken by the Board disconnecting the supply was not violative of Article 20 (1) and 14 of the Constitution and the principles of natural justice. We are in agreement with the view expressed therein.

40. In, Belwal Spinning Mills v. U.P. State Electricity Board, (1997) 6 SCC 740, the Court dealt with the provisions of Sections 26(6) and 26(7) of the Electricity Act along with Section 20 thereof. A perusal of the judgment shows that the Bench was of the view that the provisions of Section 26 would apply only when the dispute related to the correctness of the meter. That ruling also supports the contentions of the Board in this case.

VII. ARTICLE 14. CONSTITUTION OF INDIA.

41. What remains to be considered is whether Clause 39 is violative of Article 14 of the Constitution of India. Under this head, the argument of learned counsel for consumers is that the provisions in the clause are wholly unreasonable and against the principles of Natural Justice. According to them, the clause enables the officers to disconnect the service on a suspicion of malpractice and the consumer has to pay 50% of the provisional assessment amount before getting it restored. It is also contended that the officials of the Board are enabled to judge its own cause and the doctrine of bias will apply. In support of these contentions, our attention is drawn to :

None of the rulings will apply in this case. We have already referred to the judgment of this Court in, M.P. Electricity Board, Jabalpur Harshwood Products Case, (1996) 4 SCC 522, wherein it was held that when power theft was found by the officials, immediate disconnection of the supply was not violative of Article 14 of the Constitution and principles of Natural Justice would not apply.

42. In Patel Parshottamdas Vanmalidas v. Gujarat Electricity Board, AIR 1987 Gujarat 188, a Division Bench of Gujarat High Court considered similar conditions and upheld their validity. The Bench said :

We agree with the above opinion.

43. The principle 'Nemo Judex in Causa Sua' will not apply in this case as the officers have no personal lis with the consumers. As pointed out by learned senior counsel for the Board, they are similar to Income-tax or Sales Tax Officials. There is nothing wrong in their adjudicating the matters especially when the consumers may be represented by an advocate and the formula for making provisional assessment is fixed in the clause itself. An argument has been advanced that the Board has recently deleted the provision enabling the consumer to be represented by a power of attorney agent. It is contended that the consumer is thereby deprived of the assistance of an expert which may be required in technical matters. We do not agree. When the consumer is represented by a lawyer, he can certainly get such assistance as may be needed from a technical expert. It is stated by the Board's learned counsel that the provision was deleted as there was frequent misuse of the same. Whatever may be the reason for deleting the provision, the existing part of the clause enables the consumer to be represented by a advocate. That is sufficient safeguard for the consumer.

44. Learned counsel for the consumer contends that the agreement with the Board is in the standard form and signing of the same by the consumer will not prevent him from questioning it. He places reliance on certain observations in Pawan Alloys and Casting Pvt. Ltd., Meerut v. U.P. State Electricity Board, (1997) 7 SCC 251. The question in that case arose on the withdrawal of development rebate to the new industries for a period of three years. The Court held that the principle of promissory estoppel applied of the facts and circumstances of the case and by entering into the standard agreement containing provision for revision of "rate schedule" from time to time, the consumer had not given up his claim for the rebate for a period of three years as per the promise held out by the Board. That case has no bearing here.

VIII. CONCLUSION

45. In the result, we uphold the judgment and decree of the High Court in C.C.C.A. No. 38 of 1982 and dismiss Civil Appeal No. 2558 of 1988. We allow Civil Appeal Nos. 7139 to 7144 of 1997 and set aside the judgment of the Full Bench of the High Court. The Writ Petitions and Writ Appeals shall be disposed by the High Court in the light of this judgment. The parties will bear their respective costs.

Order accordingly.